Resources

 

SLC500 Series

« Go Back
Name
System Description  (6 pages)
Installation Warnings & Instructions  (2 pages)
Step 1 Rough-in Instructions
  • Running Cold Lead
  • Installing the Thermostat Wire
  • Installing the Electrical Service Requirements
  • Jumpering
 (5 pages)
Step 2 Heating Element Installation
  • Tuff Cable — Element Design & Layout
  • Tuff Cable Installation
  • Tuff Cable in New Pour Concrete
  • Tuff Cable in Mortar Bed or Lightweight Concrete
  • Tuff Cable in Sand Bed Under Pavers, Stone
  • Tuff Cable — Retrofit Installation
  • Tuff Cable Heatsink Kit Installation
  • Tuff Cable Jumpers and Connections
  • Z Mesh — Element Design & Layout
  • Z Mesh Installation
  • Placement of Z Mesh
  • Z Mesh Retrofit installation
  • Z Mesh Roof De-Icing Installation
 (26 pages)
Step 3 Transformer & Control Box Installation
  • Installation of Transformer
  • Installation of SLC500 Control Box
  • Start-up Procedures
 (10 pages)
Step 4 Activation Devices (9 pages)
System Operating Tables  (4 pages)
Useful Information  (2 pages)
Troubleshooting Procedures  (5 pages)
After Installation of Element Test  (4 pages)
Comments & Suggesions  (1 pages)