CBX6/CBX23 Series |
« Go Back |
|
Name |
|
|
|
Introduction |
(7 pages) |
|
|
Section 1 |
Rough-In Instructions
- Determine Back Plate Location
- Install the Back Plate
- Plan the Cold Lead
- Install the Cold Lead
- Cold Lead to Element Connection
- Install Thermostat Wire
- Install Electrical Service
- Jumpering Between Areas
(9 pages) |
|
|
Section 2 A |
Tuff Cable Installation
- Tuff Cable General Instructions
- Tuff Cable Specific Application Guide
- Tuff Cable in New Pour Concrete
- A Few Concrete Suggestions
- Tuff Cable Jumpers
- Tuff Cable in Mortar Bed or Lightweight Concrete
- Tuff Cable in Sand Bed Under Asphalt, Pavers, Concrete
- Tuff Cable — Retrofit Installation
- Tuff Cable Heatsink Kit on Roof or Deck
- Roof Information for Contractors
(22 pages) |
|
|
Section 2 B |
- ZMesh General Instructions
- ZMesh Repairs and Tips
- Planning ZMesh Layout
- ZMesh Specific Application Guide
- ZMesh Interior Installation
- ZMesh on Deck Installation
- ZMesh Retrofit Staple Up
- ZMesh Roof Deicing Installation
- Roof Information for Contractors
(10 pages) |
|
|
Section 3 |
Transformer Installation
(1 pages) |
|
|
Section 4 |
Control Unit Installation
CBX6 and CBX23 Sdditional Steps
CBX7 Additional Steps (5 pages) |
|
|
Section 5 |
(1 pages) |
|
|
Section 6 |
(7 pages) |
|
|
Section 7 |
- Cold Lead to Cold Lead
- Tuff Cable to Cold Lead
- Tuff Cable to Tuff Cable
- ZMesh to Cold Lead and Transition Plate
- ZMesh to ZMesh
(5 pages) |
|
|
Section 8 |
Systems Operating Tables (12 pages) |
|
|
Section 9 |
Trouble Shooting Procedures (7 pages) |
|
|
Section 10 |
After Installation Element Test (4 pages) |
|